Imágenes de página
PDF
ePub

New England-Atlantic Coastal Area The project for hurricane-flood protection at Wareham-Marion, Massachusetts, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 548, Eighty-seventh Congress, at an estimated cost of $3,811,500.

The project for navigation and hurricane-flood protection at Point Judith, Rhode Island, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 521, Eightyseventh Congress, at an estimated cost of $2,414,000.

The project for navigation and hurricane-flood control protection at Narragansett Pier, Rhode Island, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 195, Eighty-seventh Congress, at an estimated cost of $1.152.000.

Long Island Sound Area

The project for hurricane-flood control protection at New London, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 478. Eighty-seventh Congress, at an estimated cost of $2,401,000.

The project for hurricane-flood protection at Westport, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 412, Eighty-seventh Congress, at an estimated cost of $217,000.

The project for hurricane-flood protection at Mystic, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 411. Eighty-seventh Congress, at an estimated cost of $1,490,000.

Housatonic River Basin

The project for flood protection on the Naugatuck River at Ansonia-Derby, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 437, Eightyseventh Congress, at an estimated cost of $5,620,000.

Hudson River Basin

The project for flood protection on Rondout Creek and Wallkill River and their tributaries, New York and New Jersey, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 113, Eightyseventh Congress, at an estimated cost of $5,111,000.

New Jersey-Atlantic Coastal Area

The project for hurricane-flood protection and beach erosion control on Raritan Bay and Sandy Hook Bay, New Jersey, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in

House Document Numbered 464, Eightyseventh Congress, at an estimated cost of $3,097,000.

Susquehanna River Basin

The project for construction of the Fall Brook and Ayleworth Creek Reservoirs, and local flood protection works on the Lackawanna River at Scranton. Pennsylvania, is hereby authorized substantially as recommended by the Chief of Engineers, in Senate Document Numbered 141, Eighty-seventh Congress, at an estimated cost of $3,596,000.

The project for the Juniata River and tributaries, Pennsylvania, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 565, Eighty-seventh Congress, at an estimated cost of $32,150,000: Provided, That installation of the power generating facilities shall not be made until the Chief of Engineers shall submit a reexamination report to the Congress for authorization.

Delaware River Basin

The project for the comprehensive derelopment of the Delaware River Basin, New York, New Jersey, Pennsylvania, and Delaware, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, in House Document Numbered 522, Eightyseventh Congress, at an estimated cost of $192,400,000.

Potomac River Basin

The project for the North Branch of the Potomac River, Maryland and West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, in House Document Numbered 469, Eightyseventh Congress, at an estimated cost of $50,965,000.

Middle Atlantic Coastal Area

The project for hurricane-flood protection at Norfolk, Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 354, Eighty-seventh Congress, at an estimated cost of $1,537,000.

The project for hurricane-flood protection and beach erosion control at Wrightsville Beach, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 511. Eighty-seventh Congress, at an estimated cost of $345,000.

The project for hurricane-flood protection and beach erosion control at Carolina Beach and vicinity, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 418, Eighty-seventh Congress, at an estimated cost of $739,000.

Apalachicola River Basin, Georgia

The project for the West Point Reserroir, Chattahoochee River, Georgia, is hereby authorized substantially in accordance with the recommendations of

the Chief of Engineers in House Document Numbered 570, Eighty-seventh Congress, at an estimated cost of $52,900.000.

Central and Southern Florida

The comprehens...”' plan for flood control and other purposes in central and southern Florida approved in the Act of June 30, 1948, and subsequent Acts of Congress, is hereby modified to include the following items:

The project for flood protection of West Palm Beach Canal is hereby authorized substantially as recommended by the Secretary of the Army and the Chief of Engineers in Senate Document Numbered 146. Eighty-seventh Congress, at an estimated cost of $3.220.000.

The project for flood protection on Boggy Creek, Florida, is hereby authorized substantially as recommended by the Chief of Engineers in Senate Document Numbered 125, Eighty-seventh Congress, at an estimated cost of $1,176,000.

The project for South Dade County, Florida, is hereby authorized substantially in accordance with the recommendations of the Secretary of the Army and the Chief of Engineers in Senate Document Numbered 138. Eighty-seventh Congress, at an estimated cost of $13,388,000.

The project for Shingle Creek, Florida, between Clear Lake and Lake Tohopekaliga, for flood control and major drainage is hereby authorized substantially as recommended by the Chief of Engineers in Senate Document Numbered 139. Eighty-seventh Congress, at an estimated cost of $3,250,000: Provided, That no obligation shall be incurred for development of the Reedy Creek Swamp as a wildlife management area unless the State or one or more other non-Federal entities shall have entered into an agreement in adrance to assume at least 50 per centum of the cost associated with that feature of the project.

The project for flood protection in the Cutler drain area, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 123. Eighty-seventh Congress, at an estimated cost of $2,063,000: Provided. That local interests shall receive credit in the Contributed Fund Account of the project for moneys shown to have been spent after March 1, 1960, for construction of units of the authorized plan for Cutler Drain: Provided further. That such completed work must be inspected and accepted by the Chief of Engineers as constituting useful parts of the authorized plan: And provided further. That the credit established shall be in accordance with cost sharing arrangements for the central and southern Florida flood control project in an amount not to exceed $124,000.

Green Swamp Region, Florida The project for the Four River Basin, Florida, namely the Hillsborough, Oklawaha, Withlacoochee, and Peace Rivers, is hereby authorized substantially in accordance with the recommendations of

the Chief of Engineers in House Document Numbered 585, Eighty-seventh Congress, at an estimated cost of $57,760,000: Provided, That the cost sharing shall be as recommended by the Secretary of the Army in House Document Numbered 585, Eighty-seventh Congress: And provided further, That planning and construction on the Lowery-Mattie Conservation Area and its appurtenant works is deferred until additional studies are made thereon, and a further report submitted to the Congress.

Pascagoula River Basin

The project for flood protection on the Chunky Creek, Chickasawhay and Pascagoula Rivers, Mississippi, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 549, Eighty-seventh Congress, at an estimated cost of $6,740,000.

Lower Mississippi River Basin The project for flood control and improvement of the lower Mississippi River adopted by the Act approved May 15, 1928, as amended by subsequent Acts, is hereby modified and expanded to include the following item:

(a) Monetary authorizations heretofore and hereafter made available to the project or any portion thereof shall be combined into a single sum and be available for application to any portion of the project.

The project for flood control and improvement of the lower Mississippi River, adopted by the Act of May 15, 1928, as amended, is hereby modified and expanded to include construction of certain improvements in Gin and Muddy Bayous, Yazoo River Basin, Mississippi, substantially in accordance with plans on file in the Office, Chief of Engineers, subject to the approval of such plans by the Secretary of the Army and the President at an estimated cost of $150,000.

The project for hurricane-flood protection on the Mississippi River Delta at and below New Orleans, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 550, Eighty-seventh Congress, at an estimated cost of $7,502,000.

The project for flood protection on Red River in Natchitoches and Red River Parishes, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 476, Eighty-seventh Congress, at an estimated cost of $1,293,000.

The lower auxiliary channel, Yazoo River Basin, Mississippi, a unit in the Mississippi River and tributaries project, shall hereafter be known and designated as the Will M. Whittington Auxiliary Channel in honor of the late Member of the House of Representatives from the Third District of Mississippi, and former chairman of the House Public Works Committee. The Secretary of the Army, acting through the Chief of Engineers, United States Army, is hereby authorized

and directed to erect appropriate markers along the auxiliary channel designating the project "The Will M. Whittington Auxiliary Channel". Any law, regulation, document, or record of the United States in which such project is designated or referred to under the name of lower auxiliary channel, Yazoo River Basin, Mississippi, shall be held and considered to refer to such project by the name of "Will M. Whittington Auxiliary Channel".

Buffalo Bayou

The project for flood protection on Vince and Little Vince Bayous, Texas, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 441, Eightyseventh Congress, at an estimated cost of $2,240,000.

Gulf of Mexico

The project for hurricane-flood protection at Port Arthur and vicinity, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 505, Eighty-seventh Congress, at an estimated cost of $23,380,000.

The project for hurricane-flood protection at Freeport and vicinity, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 495, Eighty-seventh Congress, at an estimated cost of $3,780,000.

Trinity River Basin

The project for flood protection on the East Fork of the Trinity River, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 554, Eighty-seventh Congress, at an estimated cost of $23,760,000.

The project for extension of the Fort Worth Floodway, Texas, is hereby authorized substantially as recommended by the Chief of Engineers, in House Document Numbered 454, Eighty-seventh Congress, at an estimated cost of $5,148,000.

Brazos River Basin

The project for the San Gabriel River, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 591, Eighty-seventh Congress, at an estimated cost of $20,250,000.

The project for flood protection on the Clear Fork of the Brazos River at and in the vicinity of Abilene, Texas, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 506, Eighty-seventh Congress, at an estimated cost of $31,200,000.

Tularosa Basin

The project for flood protection at Alamogordo, New Mexico, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered

473, Eighty-seventh Congress, at an estimated cost of $2,040,000.

Rio Grande Basin

The project for flood protection at Las Cruces, New Mexico, is hereby authorized substantially as recommended by the Chief of Engineers in Senate Document Numbered 117, Eighty-seventh Congress, at an estimated cost of $3,350,000.

Arkansas River Basin

The Dardanelle lock and dam, Arkansas River, Arkansas, is hereby modified to provide for construction of a sewage outfall system for the city of Russellville, Arkansas, substantially in accordance with plans of said city, approved by the Chief of Engineers, at an estimated cost of $1,400,000.

The Secretary of the Army is hereby authorized and directed to cause an immediate study to be made under the direction of the Chief of Engineers of bank erosion on the Arkansas River between about river mile 455, near Muskogee, Oklahoma, and about river mile 495, near Coweta, Oklahoma. Such project or projects, because of its or their emergency nature, are hereby authorized as determined to be feasible and justified by the Chief of Engineers and Secretary of the Army with the approval of the President unless within the first period of sixty calendar days of continuous session of the Congress after the date on which the report is submitted to it such report is disapproved by the Congress: Provided, That the requirements for cooperation shall include provisions that iocal interests shall furnish all lands, easements, and rights-of-way; hold and save the United States free from damages; maintain and operate after completion; and make a cash contribution in recognition of any special benefits: And provided further, That with respect to any work found justified in the vicinity of Wybark, Oklahoma, local interests shall meet the requirements as stated and shall make a cash contribution of not less than $150,000 which shall include the value of all lands, easements, and rights-of-way required to be furnished, and the value of goods and services provided for purposes of project installation on a basis acceptable to the Chief of Engineers: Provided, That the cost to the Federal Government shall not exceed $2,000,000.

The project for improvement of the Verdigris River and tributaries, Oklahoma and Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 563, Eighty-seventh Congress, at an estimated cost of $62,400,000.

The project for flood protection on Big Hill Creek, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 577, Eighty-seventh Congress, at an estimated cost of $3,785,000.

The project for the Kaw Reservoir, Arkansas River, Oklahoma, is hereby au

thorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 143, Eighty-seventh Congress, at an estimated cost of $83,230,000: Provided. That nothing in this Act shall be construed as authorizing the acquisition of additional lands for establishment of a national wildlife refuge at the reservoir.

The project for flood protection on Cow Creek, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers In House Document Numbered 531. Eighty-seventh Congress, at an estimated cost of $1,560,000.

The project for flood protection on the Arkansas River at Dodge City, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 498. Eighty-seventh Congress, at an estimated cost of $2.133,000.

White River Basin

The flood protection project for Village Creek, Jackson and Lawrence Counties, Arkansas, is hereby authorized substantial as recommended by the Chief of Engineers in House Document Numbered 352, Eighty-seventh Congress, at an estimated cost of $1,968,000.

The project for flood protection on Village Creek, White River, and Mayberry Levee Districts, Arkansas is hereby modified to provide for construction of a pumping plant, substantially as recommended by the Chief of Engineers in House Document Numbered 577, Eightyseventh Congress, at an estimated additional cost of $1,018,000.

Red River Basin

That the general plan for flood control and other purposes on Red River below Denison Dam is hereby modified to authorize the Chief of Engineers to adjust the local cooperation requirements of the McKinney Bayou, Arkansas and Texas. Maniece Bayou, Arkansas, and East Point, Louisiana, projects so as to bring such requirements in accord with the recommendations of the Secretary of the Army and approval of the President, such adjustment to be made at the earliest practicable date.

The project for Sanders, Big Pine, and Collier Creeks, Texas, is hereby authorized substantially as recommended by the Chief of Engineers, at an estimated cost of $16,100,000, subject to the recommendations of the Secretary of the Army and approval of the President.

The project for Lake Kemp, Wichita River, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 144, Eightyseventh Congress, at an estimated cost of $6,410,000.

The modification of the Broken Bow Reservoir, Mountain Fork River, Oklahoma, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 137, Eighty

seventh Congress, at an estimated cost of $23,800,000.

The project for the Clayton and Tuskahome Reservoirs, Kiamichi River, Oklahoma, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 145. Eightyseventh Congress, at an estimated cost of $29,748,000.

The project providing for the construction of two experimental water quality study projects in the Arkansas-Red River Basins, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 105, Numbered 105, Eighty-seventh Congress, at an estimated cost of $300,000.

Missouri River Basin

(a) The Kaysinger Bluff Reservoir. Osage River, Missouri, is hereby modified substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 578, Eighty-seventh Congress, at an estimated additional cost of $43,245,000: Provided, that nothing in the Act shall be construed as authorizing the acquisition of additional lands for the establishment of a national wildlife refuge at the reservoir.

(b) The project for the Kansas River, Kansas, Nebraska, and Colorado, is hereby authorized substantially in accordance with the recommendations of the Secretary of the Army and the Chief of Engineers in Senate Document Numbered 122, Eighty-seventh Congress, at an estimated cost of $88,070,000: Provided, That the authorization for the Woodbine Reservoir on Lyons Creek is deferred at this time, subject to submission of a new feasibility report to the Eighty-eighth Congress, which shall take into account the water and related land resource development plans of the Soil Conservation Service, the Kansas Water Resources Board, and Lyons Creek Watershed Joint District Numbered 41, and preparation of said report is hereby authorized.

The project for flood protection on White Clay Creek at Atchison, Kansas, is hereby authorized substantially in accordance with the recommendations of Chief of Engineers in Senate Document Numbered 151, Eighty-seventh Congress, at an estimated cost of $3,495,000.

The project for flood protection on Papillion Creek and tributaries, Nebraska, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 475, Eighty-seventh Congress, at an estimated cost of $2,122,000.

The project for flood protection on Indian Creek, Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 438. Eighty-seventh Congress, at an estimated cost of $1,270,000.

The project for Grand River and tributaries, North and South Dakota, is hereby authorized substantially in ac

cordance with the recommendations of the Chief of Engineers in House Document Numbered 574, Eighty-seventh Congress, at an estimated cost of $2,670,000: Provided, That the project shall be constructed, operated, and maintained by the Chief of Er.g:reers under the direction of the Secretary of the Army.

The requirements of local cooperation on the project for flood control on the Floyd River, Iowa, authorized by Public Law 85-500, as recommended by the Chief of Engineers in House Document Numbered 417, Eighty-fourth Congress, is hereby modified to read as follows: "Provided. That responsible local interests give assurances satisfactory to the Secretary of the Army that they will (a) furnish without cost to the United States all lands, easements, and rights-of-way necessary for construction of the project: (b) hold and save the United States free from damages due to the construction works; (c) make without cost to the United States all necessary road, highway, highway bridges other than those required to carry Interstate Highway 29 over the relocated Floyd River, and utility alterations and additions; (d) contribute in cash 0.84 per centum of the estimated first cost of the work for which the United States would be responsible, a contribution presently estimated at $65,000; (e) upon authorization of the project, to take all possible action under Iowa law, short of actual purchase, to prevent additional developments within the right-of-way that might increase the overall cost of the project; and (f) maintain and operate all the works after completion in accordance with regulations prescribed by the Secretary of the Army.”

Ohia River Basin

The project for flood protection on the Kokosing River, Ohio, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 220, Eighty-seventh Congress, at an estimated cost of $2,438,000.

The project for flood protection on the Wabash River at and in the vicinity of Mount Carmel, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 573, Eighty-seventh Congress, at an estimated cost of $1.417000.

The project for flood protection on the Mad River above Huffman Dam, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 439, Eighty-seventh Congress, at an estimated cost of $7.930,000.

The project for the Kentucky River, Kentucky, is hereby authorized substantially in accordance in House Document Number 423. Eighty-seventh Congress, at an estimated cost of $26.020.000.

The project for Twelvepole Creek, West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 520, Eightyseventh Congress, at an estimated cost of $11,000,000.

The project for the Guyandot River and tributaries, West Virginia, is hereby authorized substantially in accordance with the recomendations of the Chief of Engineers in House Document Numberer 569, Eighty-seventh Congress, second session, at an estimated cost of $60,477,000.

The project for flood protection on the Buckhannon River, West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engneers in Senate Document Numbered 43, Eighty-seventh Congress, at an estimated cost of $1,206,000.

The project for flood protection on Crab Creek at Youngstown, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 440, Eighty-seventh Congress, at an estimated cost of $2,268,000.

The project for the Scioto River, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 587, Eighty-seventh Congress, at an estimated cost of $55,307,000: Provided, That nothing in this Act shall be construed as authorizing the acquisition of additional lands for the establishment of a wildlife refuge in this project.

The project for flood protection on the Allegheny River at Salamanca, New York, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 166, Eighty-seventh Congress, at an estimated cost of $1,390,000.

The project for French Creek, Pennsylvania, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 95, Eightyseventh Congress, at an estimated cost of $23,102,000.

The project for the Saline River and tributaries, Illinois, authorized by the Flood Control Act of 1958 (Public Law 85-500) is hereby modified to authorize the Chief of Engineers to adjust the cash contribution required of local interests to such amount as is recommended by the Secretary of the Army and approved by the President, such adjustment to be made at the earliest possible date.

Upper Mississippi River Basin The project for the Illinois River and tributaries, Illinois, Wisconsin, and Indiana, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 472, Eighty-seventh Congress, at an estimated cost of $71,465,000.

The project for Rend Lake, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 541, Eighty-seventh Congress, at an estimated cost of $35,500,000.

The project for flood protection on the Mississippi River at and in the vicinity of Guttenberg, Iowa, is hereby authorized

substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 286, Eighty-seventh Congress, at an estimated cost of $729,000.

The project for flood protection on the Mississippi River between Sainte Genevieve and Saint Marys, Missouri, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 519, Eighty-seventh Congress, at an estimated cost of $2,500,000.

The project for the Harrisonville and Ivy Landing Drainage and Levee District Numbered 2, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 542, Eighty-seventh Congress, at an estimated cost of $1,112,000.

The project for the Columbia Drainage and Levee District Numbered 3, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 543, Eightyseventh Congress, at an estimated cost of $986,000.

The project for the Prairie DuPont Levee and Sanitary District, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 540, Eighty-seventh Congress, at at an estimated cost of $921,000.

The project for flood protection on Richland Creek, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 571, Eighty-seventh Congress, at an estimated cost of $4,995,000.

The project for the Joanna Reservoir, Salt River, Missouri, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 507, Eighty-seventh Congress, at an estimated cost of $63,300,000.

The project for flood protection on the Pecatonica River, Illinois and Wisconsin, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 539, Eighty-seventh Congress, at an estimated cost of $850,000.

The project for flood protection on Rock River at Rockford, Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 142, Eighty-seventh Congress, at an estimated cost of $7,228,000.

The project for the Mississippi River urban areas from Hampton, Illinois, to mile 300, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 564, Eightyseventh Congress, at an estimated cost of $9,289,000.

The project for the Mississippi River urban areas from Hampton, Illinois, to Cassville, Wisconsin, is hereby authorized substantially in accordance with the

recommendations of the Chief of Engineers in House Document Numbered 450, Eighty-seventh Congress, at an estimated cost of $5,350,000.

The project for the Kickapoo River, Wisconsin, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 557, Eighty-seventh Congress, at an estimated cost of $15,570,000.

The project for flood protection on the Warroad River and Bull Dog Creek, Minnesota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 449, Eighty-seventh Congress, at an estimated estimated cost of $972,000.

Great Lakes Basin

The project for flood protection on the River Rouge, Michigan, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 148, Eighty-seventh Congress, at an eştimated cost of $8,659,000.

The project for flood protection on the Sandusky River, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 136, Eighty-seventh Congress, at an estimated cost of $4,300,000.

Gila River Basin

The project for the Camelsback Reservoir, Gila River, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 127, Eighty-seventh Congress, at an estimated cost of $9,770,000.

The project for flood protection on the Gila River below Painted Rock Reservoir, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 116, Eightyseventh Congress, at an estimated cost of $18,255,000.

The project for flood protection on Pinal Creek, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 512, Eighty-seventh Congress, at an estimated cost of $1,300,000.

Truckee River Basin

The project for flood protection on the Truckee River and tributaries, California and Nevada, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 435, Eightyseventh Congress, at an estimated cost of $2,385,000.

San Francisco Bay area

The project for flood protection on Alameda Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 128, Eighty-seventh Congress, at an estimated cost of $14,880,000.

The project for Corte Madera Creek, Marin County, California, is hereby au

thorized substantially in accordance with the recommendations of the Secretary of the Army and the Chief of Engineers in House Document Numbered 545, Eightyseventh Congress, at an estimated cost of $5,534,000: Provided, That local interests shall contribute in cash 3 per centum of the Federal construction of the Rose Valley unit with a contribution presently estimated at $158,000.

San Joaquin River Basin

The l'ew Melones project, Stanislaus River, California, authorized by the Flood Control Act approved December 22, 1944 58 Stat. 887), is hereby modified substantially in accordance with the recommendations of the Chief of Engineers in House Documents Numbered 453, Eighty-seventh Congress, at an estimated cost of $113,717,000: Provided, That upon completion of construction of the dam and powerplant by the Corps of Engineers, the project shall become an integra' part of the Central Valley project and be operated and maintained by the Secretary of the Interior pursuant to the Federal reclamation laws, except that the flood control operation of the project shall be in accordance with the rules and regulations prescribed by the Secretary of the Army: Provided further, That the Stanislaus River Channel, from Goodwin Dam to the San Joaquin River, shall be maintained by the Secretary of the Army to a capacity of at least eight thousand cubic feet per second subject to the condition that responsible local interests agree to maintain private levees and to prevent encroachment on the existing channel and floodway between the levees: Provided further, That before inItiating any diversion of water from the Stanislaus River Basin in connection with the operation of the Central Valley project, the Secretary of the Interior shall determine the quantity of water required to satisfy all existing and anticipated future needs within that basin and the diversions shall at all times be subordinate to the quantities so determined: Provided further, That the Secretary of the Army adopt appropriate measures to insure the preservation and propagation of fish and wildlife in the New Melones project and shall allocate to the preservation and propagation of fish and wildlife, as provided in the Act of August 14, 1946 (60 Stat. 1080), an appropriate share of the cost of constructing the Stanislaus River division and of operating and maintaining the same: Provided further, That the Secretary of the Army, in connection with the New Melones project, construct basic public recreation facilities, acquire land necessary for that purpose, the cost of constructing such facilities and acquiring such lands to be nonreimbursable and nonreturnable: Provided further, That contracts for the sale and delivery of the additional electric energy available from the Central Valley project power system as a result of the construction of the plants herein authorized and their integration with that system shall be made

in accordance with preferences expressed in the Federal reclamation laws except that a first preference, to the extent as needed and as fired by the Secretary of the Interior, but not to exceed 25 per centum of such additional energy, shall be given, under reclamation law, to preference customers in Tuolumne and Calaveras Counties, California, for use in that county, who are ready, able, and willing. within twelve months after notice of availability by the Secretary of the Interior, to enter into contracts for the energy and that Tuolumne and Calaveras County preference customers may exercise their option in the same date in each successive fifth year providing written notice of their intention to use the energy is given to the Secretary not less than eighteen months prior to said dates: And provided further, That the Secretary of the Army give consideration during the preconstruction planning for the New Melones project to the advisability of including storage for the regulation of streamflow for the purpose of downstream water quality control.

The Hidden Reservoir, Fresno River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 37, Eightyseventh Congress, at an estimated cost of $14,338,000.

The Buchanan Reservoir, Chowchilla River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 98, Eighty-seventh Congress, at an estimated cost of $13,585,000.

The project for flood protection on Mormon Slough, Calaveras River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 576, Eighty-seventh Congress, at an estimated cost of $1,960,000.

Russian River Basin

The project for Russian River, Dry Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 547, Eighty-seventh Congress, at an estimated cost of $42,400,000.

Redwood Creek Basin

The project for flood protection on Redwood Creek, Humboldt County, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 497, Eighty-seventh Congress, at an estimated cost of $2,580,000.

Los Angeles River Basin

In addition to previous authorizations, there is hereby authorized to be appropriated the sum of $3,700,000 for the prosecution of the comprehensive plan for the Los Angeles River Basin approved in the Act of August 18, 1941, as amended and supplemented by subsequent Acts of Congress.

Rogue River Basin

The project for the Rogue River, Oregon and California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 566, Eighty-seventh Congress, at an estimated cost of $106.700,000, subject to the conditions of local cooperation specified in said report: Provided, That the project is to be located, constructed, and operated to accomplish the benefits as set forth and described in the report and appendizes: And provided further, That in the years of short water supply all water users will share the available water in the same proportions that they would share the total full supply when it is available, and that no further water-use allocations will be made from the authorized storage so as to retain the maximum possible benefits to authorized uses during the periods of adversity when storage shortages occur.

Columbia River Basin

The projects and plans for the Columbia River Basin, including the Willamette River Basin, authorized by the Flood Control Act of June 28, 1938, and subsequent Acts of Congress, including the Flood Control Acts of May 17, 1950, September 3, 1954, July 3, 1958, and July 14, 1960, are hereby modified to include the projects listed below for flood control and other purposes in the Columbia River Basin (including the Willamette River Basin) substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 403, Eighty-seventh Congress: Provided, That the depth and width of the authorized channel in the ColumbiaSnake River barge navigation project shall be established as fourteen feet and two hundred and fifty feet, respectively, at minimum regulated flow.

Asotin Dam, Snake River, Idaho and Washington;

Bruces Eddy Dam and Reservoir, North Fork, Clearwater River, Idaho:

Strube Reregulating Dam and Reservoir, South Fork, McKenzie River, Oregon;

Gate Creek Dam and Reservoir, Gute Creek, Oregon;

Fern Ridge Dam and Reservoir molification, Long Tom River, Oregon; Cascadia Dam and Reservoir, South Santiam River, Oregon.

The project for the Ririe Dam and Reservoir, Willow Creek, Idaho, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 562, Eighty-seventh Congress, at an estimated cost of $7,027,000.

The project for the Blackfoot Dam and Reservoir, Blackfoot River, Idaho, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 568, Eighty-seventh Congress, at an estimated cost of $829.

000.

« AnteriorContinuar »